PuT operating indicators: Revenue tab
The revenue indicators (Fundamentals: Calculation of operating costs and fare gains (revenues)) include the following indicators:
- Operating costs (Fundamentals: Calculation of the operating costs) and
- revenues from fares and cost coverage (Fundamentals: Calculation of the fare revenues (revenue calculation)).
Note: You can only calculate cost coverage if you have activated the Line costing calculation add-on (Enabling or disabling add-ons).
|
Element |
Description |
Calculate for line hierarchy |
If this option has been selected, the indicators of the revenue calculation are calculated. |
Calculate for territories |
If this option has been selected, the indicators are additionally calculated by territory. |
Save only for active time profiles |
If this option has been selected, the revenue indicators are stored only for active time profiles. |
Revenue calculation method |
The current selection is displayed. To make changes, go to Calculate > General procedure settings > PuT settings > Revenues, or Network > PuT fares (Selecting the revenue calculation method and the distribution method and PuT operating indicators: Infrastructure cost tab). |
Calculate indicators for |
The current selection is displayed. You can make changes in the Parameters: PuT operating indicators window (PuT operating indicators: General tab) |
Save paths |
The current selection is displayed. To make changes, go to Calculate > General procedure settings > PuT settings > Assignment (Settings for saving PuT assignment results). |
Selecting the revenue calculation method and the distribution method
1. Make sure, that the input attributes required by this method have been set.
2. Open Calculate > General procedure settings > PuT settings > Revenues and follow the steps outlined below:
- Select the appropriate revenue calculation method.
- Set the respective revenue calculation parameters (except for fare model).
- Change the settings accordingly for revenue distribution to path legs.
Revenue calculation |
Revenue distribution (Fundamentals: Revenue distribution) |
Revenue from fare model |
Additionally, the revenue distribution can be modified by the following:
|
Fixed revenue per passenger trip (Revenue calculation using a fixed revenue per PTripUnlinked) |
Additionally, the revenue distribution can be modified by the following:
|
Revenue per fare point |
Additionally, the revenue distribution can be modified by the following:
|